prime365ph.com
  • Home
  • About
  • Services
  • Portfolio
prime365ph.com
  • Home
  • About
  • Services
  • Portfolio

Prime 365 consists of a team professionals who specialize in BIM Modeling services and Construction Support Management Services.

contact us

The prime 365 process

here's an overview of our projects...

1. BIM EXECUTION PLAN (BEP) COMPLIANCE

  • Adherence to the project's BIM Execution Plan, ensuring compliance with industry standards, local codes, and project requirements.
  • Implementation of naming conventions, file organization, and data structuring as per the BEP.

2. LEVEL OF DEVELOPMENT (LOD)

  • LOD 200: Generic representation of electrical elements with approximate locations.
  • LOD 300: Precise modeling of electrical components with accurate dimensions and spatial coordination.
  • LOD 350-400: Detailed elements including connections, supports, and fabrication-ready data if required by the project.

3. ELECTRICAL SYSTEM MODELING

  • Lighting and power distribution layouts for lighting fixtures, power outlets, and panel boards.
  • Conduits and cable tray routing designed based on space constraints and coordination with other building systems.
  • Switchgear and panel placements, including transformers, distribution panels, and their interconnections.
  • Emergency systems integration, covering backup power sources such as generators and UPS.
  • Low voltage systems incorporating audio visual data, fire alarms, security, telecoms and data infrastructure.

4. CLASH DETECTION & COORDINATION

  • Identification and resolution of clashes with architectural, mechanical, plumbing, and structural models using Navisworks.
  • Conducting coordination meetings with Electricians Inc. to review and resolve clashes.

5. DOCUMENTATION & DELIVERABLES

  • Electrical BIM model fully coordinated in Revit in “.rvt” and/or “.nwc” format.
  • Schedules including plans, panel schedules, diagrams, and wiring layouts extracted from the BIM model.
  • 2D Drawings & Schedules includes Plans, panel schedules, riser diagrams, and wiring layouts extracted from the BIM model in “.pdf” format.
  • Clash reports detailing detected conflicts and their resolutions.
  • As-built model reflecting final site conditions after construction completion.

6. QUALITY CONTROL & REVIEW

  • Regular model audits to ensure compliance with BIM standards.
  • QA/QC checks for accuracy, alignment, and data consistency.
  • Iterative model updates based on feedback and site conditions.

7. PROJECT TIMELINE

  • Establishment of project milestones and submission schedules.
  • Periodic progress reviews with Electricians Inc. to ensure timely delivery.

8. SOFTWARE & TOOLS

  • Revit for modeling electrical systems and sheet generation
  • Navisworks for clash detection and coordination.

9. COLLABORATION & COMMUNICATION

  • Coordination with project teams through Microsoft Teams and Email.
  • Regular project meetings for updates and issue resolution.

Copyright © 2025 prime365ph.com - All Rights Reserved.

Powered by

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

Accept